450+Km Surveyed
Overview
India's infrastructure boom demands accurate geospatial data at every stage — from feasibility studies through construction monitoring to maintenance. Aeronica has delivered corridor surveys, structural audits, and progress monitoring for major infrastructure projects across Central Railway, state highway authorities, and private developers.
Key Project: Central Railway Corridor Mapping
Aeronica was engaged by Central Railway to survey 450+ kilometers of operational railway corridor for alignment verification, drainage assessment, and asset inventory. The project required flying over active rail lines with precise timing coordination with train schedules.
450+ km
Corridor Length
120+
Flight Hours
3.2 TB
Data Delivered
60%
Time Saved
Impact & Outcomes
- Delivered sub-centimeter alignment data 60% faster than traditional ground survey methods
- Identified 40+ drainage issues and vegetation encroachments requiring immediate maintenance attention
- Created a complete digital asset inventory including signal posts, level crossings, and bridge structures
- Provided time-series data for monitoring track ballast degradation and corridor encroachment
- Established a baseline survey protocol now used for annual corridor review cycles